2-4-23
F51X
F52X
F53X
F55X
F56X
F57X
Abnormality detecting in a JOB execution part
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
Since the USB log immediately after occur-
rence is needed for analysis, please give
me cooperation of acquisition.
F58X
F59X
F5AX
F5BX
F5CX
F5DX
F5EX
Abnormality detecting in the various-services
Management Department
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
Since the USB log at the time of occur-
rence is needed for analysis, please give
me cooperation of acquisition.
F5DX (especially if X is 9,A,B,C or D)
occurs when processing FAX reception
and URDS related matter.
When occurred, check data sent from
PC.
F5FX
Abnormality detecting in a service execution
part
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
Since the USB log immediately after occur-
rence is needed for analysis, please give
me cooperation of acquisition.
F62X
Abnormality detecting in a service execution
part
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
Since the USB log at the time of occur-
rence is needed for analysis, please give
me cooperation of acquisition.
USB log at the time of occurrence is
required for the analysis.
F63X
Abnormality detecting in a device control sec-
tion
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
F68X
Abnormality detecting in a storage device con-
trol section
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
* F684 is the overwrite error at the time of
an HDD security kit.
Each of the SSD / HDD to check the
operation after initializing. (U024 of SSD
/ FULL, U024 of HDD / FULL)
Number
Contents
Verification procedure & check point
Remarks
Content
Summary of Contents for d-Copia 3002MF plus
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 67: ...1 2 40 This page is intentionally left blank Y118240 1 Service Manual...
Page 484: ...2 2 8 This page is intentionally left blank Y118240 1 Service Manual...
Page 548: ...Installation Guide DP 7100 Document processor Installation Guide...
Page 549: ...DP 7100...
Page 553: ...2 1mm 0mm A D C B B A...
Page 554: ...3 E A...
Page 555: ...4 I M3x8 F G M4x10 K J H A...
Page 556: ...5 ON A...
Page 558: ...7 D E B...
Page 559: ...8 F G M4x10 H I M3x8 K J B...
Page 560: ...9 B...
Page 570: ...19 8 6 7 10 11 9 A B...
Page 580: ...DP 7110 Document processor Installation Guide...
Page 584: ...2 2 2 C M4x14 E 2 A...
Page 585: ...3 F G H M3x8 BLACK A...
Page 586: ...4 I A...
Page 587: ...5 J L K M3x8 K M3x8 K M3x8 A...
Page 588: ...6 O N A...
Page 589: ...7 ON A...
Page 591: ...9 2 2 2 C M4x14 E B...
Page 592: ...10 F G H M3x8 BLACK B...
Page 593: ...11 I B...
Page 594: ...12 J L P K M3x8 K M3x8 B...
Page 595: ...13 O N B...
Page 615: ...DP 7120 Document processor Installation Guide...
Page 619: ...2 1mm 0mm B B A D C A...
Page 620: ...3 E A...
Page 621: ...4 G F F H ON 10 mm 10 mm A...
Page 623: ...6 D B...
Page 624: ...7 E B...
Page 625: ...8 F ON G F H 10 mm 10 mm B...
Page 634: ...17 2 6 7 3 4 5 A B...
Page 636: ...19 9 11 10 13 14 12 10 mm A B...
Page 646: ...PF 791 500 x 2 Paper feeder Installation Guide...
Page 654: ...PF 810 3000 sheet deck Installation Guide...
Page 667: ...DF 791 3000 sheet finisher Installation Guide...
Page 682: ...DF 7120 1000 sheet finisher Installation Guide...
Page 686: ...2 7 7 15 a b a a b b b a A...
Page 687: ...3 A...
Page 688: ...4 c d 14 c d c d 12 c d c d 14 c d c d 12 c d A...
Page 689: ...5 D ON A...
Page 691: ...7 L B...
Page 693: ...9 G B...
Page 694: ...10 b a 17 17 25 a b a a b b B...
Page 695: ...11 c d 24 c d c d 22 c d B...
Page 696: ...12 B...
Page 697: ...13 ON D B...
Page 700: ...AK 740 Bridge unit Installation Guide...
Page 702: ...MT 730 Mailbox Installation Guide...
Page 717: ...PH 7A C D Punch unit Installation Guide...
Page 738: ...DT 730 B Document tray Installation Guide...
Page 740: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8...
Page 741: ...FAX System 12 Installation Guide...