In the Multi-Stack Operator Interface:
1. Navigate to the
Stack Status
tab. You should see details of the stacks that the Battery Control
Panel can communicate with (i.e. they have been previously configured as
installed
).
2. For each stack, click the
Enable
button. When all stacks are enabled the screen should look like
this:
Nuvation Energy Battery Control Panel - Product Manual
Document ID: NE-PM-005
26
Rev 1.1, 2020-10-14
Curie Update 2