
October 2002
Replacing a hard drive, tape drive, CD-ROM drive, or floppy drive
Part 5: 702t Server Maintenance and Diagnostics
141
10
For a non-RAID system, refer to the diagram in “Cabling for a non-RAID
system with CD-ROM and tape drive” on page 130 for a cabling example.
Cable the tape drive as shown in the diagram and described in these
substeps:
a.
Connect a narrow-to-wide SCSI adapter to the server’s narrow SCSI
controller.
b.
Connect a 68-pin SCSI cable to the narrow-to-wide SCSI adapter on
the motherboard.
c.
Attach a wide SCSI terminator to the other end of the SCSI cable.
d.
Connect one of the middle connectors of the SCSI cable to the tape
drive.
11
Attach the power cable to the tape drive.
Result:
The tape drive is installed.
12
Replace the server covers.
13
Test the tape drive.
Summary of Contents for CallPilot 702t
Page 2: ...P0949453 ...
Page 6: ...vi CallPilot Publication history Standard 1 0 ...
Page 26: ...Troubleshooting your CallPilot system Standard 1 0 26 CallPilot ...
Page 50: ...Using Windows NT online diagnostic tools Standard 1 0 50 CallPilot ...
Page 62: ...Using serial port diagnostic tools Standard 1 0 62 CallPilot ...
Page 76: ...Using CallPilot Manager to monitor hardware Standard 1 0 76 CallPilot ...
Page 102: ...Using CallPilot Manager to monitor hardware Standard 1 0 102 CallPilot ...
Page 194: ...Performing RAID maintenance Standard 1 0 194 CallPilot ...
Page 240: ...Performing RAID maintenance Standard 1 0 240 CallPilot ...
Page 254: ...Replacing or adding voice processing boards Standard 1 0 254 CallPilot ...
Page 264: ...Replacing DIMMs and the CPU Standard 1 0 264 CallPilot ...
Page 284: ...SSU and BIOS Standard 1 0 284 CallPilot ...
Page 304: ...Index Standard 1 0 304 CallPilot ...
Page 305: ......