Replacing a hard drive, tape drive, CD-ROM drive, or floppy drive
Standard 1.0
134
CallPilot
16
Swing the bay to the right into the chassis. Refer to “B” in the above
diagram.
17
Secure the bay with the screws you removed earlier, and tighten the
screws firmly. Refer to “C” in the above diagram.
18
Attach power and signals cables to all drives installed in the bay. Connect
the SCSI signal cable to the wide connector on the baseboard or to the
RAID controller, as appropriate.See “SCSI and IDE cabling illustrations”
on page 126.
For proper cooling and air flow, neatly fold and secure the excess signal
cable so that the cable does not drape across the baseboard or add-in
boards. Use a tie wrap or cable clip to tie back the cable.
19
Reinstall the side cover.
20
Do one of the following steps:
a.
If this is a RAID system, then rebuild the new hard drive.
b.
If this is a non-RAID system, run the SCSI Select utility to configure
the new hard drive.
Result:
Hard drive replacement is complete.
To install an additional hard drive
1
Disconnect power and signal cables from all drives installed in the bay.
2
Remove and save the three screws holding the bay to the chassis.
3
Swing the bay out to the left of the chassis.
4
Slide the bay upward to disengage its tabs from the chassis.
5
Remove the bay from the chassis, and place it on an antistatic surface.
6
Remove the new drive from its protective wrapper, and place it on an
antistatic surface.
7
Record the drive model and serial numbers in your equipment log.
8
Set the SCSI ID by setting any jumpers or switches, referring to Nortel
Networks specifications and the drive manufacturer’s instructions. See
“Hard drive location and SCSI ID configuration” on page 136 for required
SCSI ID settings.
Summary of Contents for CallPilot 702t
Page 2: ...P0949453 ...
Page 6: ...vi CallPilot Publication history Standard 1 0 ...
Page 26: ...Troubleshooting your CallPilot system Standard 1 0 26 CallPilot ...
Page 50: ...Using Windows NT online diagnostic tools Standard 1 0 50 CallPilot ...
Page 62: ...Using serial port diagnostic tools Standard 1 0 62 CallPilot ...
Page 76: ...Using CallPilot Manager to monitor hardware Standard 1 0 76 CallPilot ...
Page 102: ...Using CallPilot Manager to monitor hardware Standard 1 0 102 CallPilot ...
Page 194: ...Performing RAID maintenance Standard 1 0 194 CallPilot ...
Page 240: ...Performing RAID maintenance Standard 1 0 240 CallPilot ...
Page 254: ...Replacing or adding voice processing boards Standard 1 0 254 CallPilot ...
Page 264: ...Replacing DIMMs and the CPU Standard 1 0 264 CallPilot ...
Page 284: ...SSU and BIOS Standard 1 0 284 CallPilot ...
Page 304: ...Index Standard 1 0 304 CallPilot ...
Page 305: ......