Installation
3‐2
P/N 213828_11
2014 Nordson Corporation
VersaBlue_PPA
Lifting (Unpacked Melter)
Refer to the section
Technical Data
for weight. Lift melter only at the chassis
using suitable lifting equipment or a forklift.
Installation Requirements
Set up only in an environment that corresponds to the stated Degree of
Protection (Refer to section
Technical Data
). Do not set up in a potentially
explosive atmosphere! Protect from vibration.
Protect the control panel from direct sunlight. The UV rays reduce the
serviceable life of the liquid crystals and disrupt the function test when
booting.
Required Space
NOTE: *)
For minimum bending radius refer to the hose manual
270
1385
1445
855
245
400
210
1270
*)
V12 and V25
270
1385
1760
1585
1055
245
600
210
1665
*)
V50
Summary of Contents for VersaBlue VA
Page 12: ...Table of Contents X P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 28: ...Safety Instructions 1 14 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 40: ...Introduction 2 12 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 62: ...Installation 3 22 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 74: ...Operation 4 12 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 142: ...Operation 4 80 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 174: ...Maintenance 5 26 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 204: ...Troubleshooting 6 30 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 234: ...Repair 7 30 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 248: ...Password A 4 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...
Page 272: ...Glossary D 16 P N 213828_11 2014 Nordson Corporation VersaBlue_PPA...