Page 64/112
GEO
S12
HARDWARE SETUP PROCEDURE
0˚
-5˚
+5˚
GEO S12 ground stack device description
GEOS12-GSTK ground stack device includes:
•
two supporting beams, which support assembly weight;
•
two connecting beam, which allow connection of the beams to the first cabinet;
•
one reinforcement beam, to rigidify ground stack device sideways;
•
Axis, “R” clips and handles to assemble the ground stack device
Procedure
•
Assemble the two connecting beam and the reinforcement beam with the handles;
•
Depending on tilt angle – negative, null or positive - to be achieved, there are three positions to
connect above assembly to the supporting beams; below drawings detail these configurations:
•
Connect the reinforcement bar to the supporting beams according to required tilt angle
configuration using 2 axis per side; secure the axis with provided “R” clips;
Summary of Contents for GEO S12 Series
Page 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Page 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...