GEO
S12
HARDWARE SETUP PROCEDURE
Page
47/112
R > H
H
8.4.2 Single GEO S12 on speaker stand or on RS15 horizontally
Required items
•
1 x “U” Bracket for single horizontal GEO S12 (GEOS12-SSBRK-V2);
•
1 x Speaker stand diameter 35mm (K&M 213 or equivalent);
•
Or NEXO PS pole stand (STDPS) for mounting on top of RS15
IMPORTANT (SPEAKER STAND)
- Speaker stand must be rated for assembly weight (40kg rated load min);
- Speaker stand must always be installed on a horizontal surface;
- Stand height and footprint must be defined to prevent assembly from collapsing;
- Ensure that public is not allowed within a safety area which radius is equal or higher
than assembly height.
IMPORTANT (RS15 POLE STAND)
- NEXO STDPS pole stand only should be used for mounting on top of NEXO RS15
- If 2 RS15s are to be stacked below GEO S12s pole mounted, they should be connected
together through use of RS15 rigging plates;
- RS15s must always be installed on a horizontal surface;
- Ensure that public is not allowed within a safety area which radius is equal or higher
than assembly height.
Procedure
•
Slide GEOS12-SSBRK-V2 side plates into GEO S12 connecting plate oblong holes;
•
Lock safety pins into GEO S12 connecting plate;
IMPORTANT
Ensure that safety pins are properly locked into GEO S12 connecting panels.
•
Position “U” bracket over these side plates; align centre holes;
•
Insert adjustment handles, adjust vertical angle and tight the handles to prevent GEO S12 from
rotating around “U” bracket;
•
Lift assembly on speaker stand or on RS15 with STDPS pole stand.
Summary of Contents for GEO S12 Series
Page 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Page 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...