HARDWARE SETUP PROCEDURE
•
Lift and position assembly, connect lifting rings to suspension points with sling and shackle;
•
Secure assembly with secondary safety steel.
IMPORTANT
The requirements for secondary safety systems vary with territories. However, the
secondary safety steel MUST have a SWL equivalent or greater than that of the rigging
system.