GEO
S12
HARDWARE SETUP PROCEDURE
Page
67/112
8.5 Testing and Maintenance of the system
•
General: Geo is a precision piece of equipment and requires regular attention to maintenance in
order to give long and reliable service. NEXO recommends regular testing of loudspeaker rigging
components, preferably using a suitable test rig coupled with a visual inspection.
•
Fasteners: there are several critical points in the GEO S12 cabinets.
•
Of primary concern are:
•
a) The grid screws attaching the grid to the cabinet
•
b) The machine screws attaching the connecting plates to the cabinet.
•
c) The screws attaching the directivity flanges to the front of the cabinet.
•
These fasteners should be regularly checked and tightened as necessary.
•
Cleaning: The exterior of the cabinet and the rigging system can be cleaned with a damp cloth
soaked in mild soapy water. On no account use solvent based cleaners , which may damage the
finish of the cabinet
•
After cleaning, the rigging system must be treated with a suitable lubricant to prevent rusting.
NEXO recommends the use of Scottoil FS365 which is a water-based lubricant with a mixture of
machine oil, surfactant and anti-rust treatment.
Summary of Contents for GEO S12 Series
Page 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Page 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...