GEO
S12
HARDWARE SETUP PROCEDURE
Page
49/112
8.4.3 Single GEO S12 flown vertically
Required items
•
1 x Flying Bar for single vertical GEO S12 (GEOS12-TTC-V2)
•
1 x Lifting Ring (GEOS12-XHBRK)
•
Or 1 x Truss hook (GEOS12-TCBRK-V2)
IMPORTANT
Ensure that truss suspension point is strong enough to hold GEO S12 weight.
Procedure
•
Slide flying bar GEOS12-TTC-V2 into GEO S12 connecting plate oblong holes;
•
Lock safety pin into GEO S12 connecting plate;
IMPORTANT
Ensure that safety pin is properly locked into GEO S12 connecting panel.
Cable suspension:
•
Connect lifting ring GEOS12-XHBRK to flying bar by inserting 8x45 quick release pin in required
holes for proper vertical aiming;
•
Ensure lifting ring is properly locked to flying bar;
•
Connect assembly to suspension point with sling and shackle (not provided).
Truss suspension
•
Connect truss hook GEOS12-TCBRK-V2 to flying bar by inserting 8x45 quick release pin in
required holes for proper vertical aiming;
•
Ensure truss hook is properly locked to flying bar;
•
Lift and position assembly, lock hook on truss suspension point and secure with hook cable.
Summary of Contents for GEO S12 Series
Page 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Page 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...