I
NTRODUCTION
Page
5/112
6
GEOSoft2....................................................................................................................... 28
7
Configurable Directivity Device................................................................................... 29
7.1
Installing & removing GEO’s Configurable Directivity flanges ................................. 29
7.2
When & where to use Configurable Directivity flanges ............................................ 30
8
GEO S12 hardware setup procedure .......................................................................... 31
8.1
SAFETY FIRST ....................................................................................................... 31
8.1.1 Flown
Systems Safety...................................................................................... 31
8.1.2 Ground
Stacking Safety ................................................................................... 32
8.1.3 Contacts ........................................................................................................... 33
8.2
General Description................................................................................................. 34
8.2.1 Described
configurations.................................................................................. 35
8.2.2
WARNINGS ON GEO S12 ACCESSORIES .................................................... 36
8.3
GEO S12 in fixed installations ................................................................................. 37
8.3.1 Fixed
installation
Accessories and kits ............................................................. 37
8.3.2
Single GEO S12 rigidly mounted on a wall or a ceiling (vertical or horizontal) . 38
8.3.3
Single GEO S12 cable mounted on a wall or a ceiling (vertical or horizontal).. 39
8.3.4
GEO S12 vertical array rigidly mounted on a ceiling ........................................ 40
8.3.5
GEO S12 vertical array cable mounted on a ceiling ......................................... 42
8.3.6
GEO S12 horizontal array rigidly mounted on a ceiling .................................... 43
8.3.7
GEO S12 horizontal array cable mounted on a ceiling..................................... 45
8.4
GEO S12 in touring applications ............................................................................. 46
8.4.1 Touring
Accessories......................................................................................... 46
8.4.2
Single GEO S12 on speaker stand or on RS15 horizontally ............................ 47
8.4.3
Single GEO S12 flown vertically....................................................................... 49
8.4.4
Single GEO S12 flown horizontally................................................................... 50
8.4.5
Two GEO S12 on wind-up stand or on RS15 horizontally................................ 51
8.4.6
Two GEO S12 flown horizontally...................................................................... 55
8.4.7
Two or more GEO S12 flown vertically............................................................. 56
8.4.8
Three or more GEO S12 flown horizontally......................................................59
8.4.9 Ground
stacked GEO S1210............................................................................63
8.5
Testing and Maintenance of the system .................................................................. 67
Summary of Contents for GEO S12 Series
Page 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Page 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...