Page 42/112
GEO
S12
HARDWARE SETUP PROCEDURE
8.3.5 GEO S12 vertical array cable mounted on a ceiling
Required items
•
1 x GEOS12-FBUMPER;
•
2 x GEO S12-LBRK (allows cable suspension for bumper, holes for cable suspension are 10mm
diameter);
•
(N-1) x GEOS12-ANPL for a N x GEO S12 array (ANPL1 ranges from 0.2° to 3.15°, ANPL2
ranges from 5° to 10°, ANPL3 ranges from 16° to 30°)
•
4 slings and shackles (not provided)
IMPORTANT
Ensure that the ceiling is strong enough to hold GEO S12 cluster weight and that the
cables suspension system required fixing the bumper under the ceiling is properly
dimensioned.
Procedure
•
Connect the bumper and the two “L” brackets using the screws, washers and bolts provided in
the GEO S12-LBRK kit;
•
Proceed as in preceding section;
•
4 slings and 4 shackle (not provided) are required to secure the cluster under the ceiling;
Summary of Contents for GEO S12 Series
Page 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Page 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...