GEO
S12
HARDWARE SETUP PROCEDURE
Page
55/112
8.4.6 Two GEO S12 flown horizontally
Required items
•
1 x “U” Bracket for two GEO S12s (GEOS12-PSBRK-V2)
•
1 x Lifting Ring (GEOS12-XHBRK)
•
Or 1 x Truss hook (GEOS12-TCBRK-V2)
IMPORTANT
Ensure that suspension point is strong enough to hold two GEO S12s weight.
Procedure
•
Slide GEOS12-PSBRK-V2 side plates into GEO S12s connecting plate oblong holes;
•
Lock safety pins into GEO S12s connecting plate;
IMPORTANT
Ensure that safety pins are properly locked into GEO S12s connecting panels.
•
Adjust inter-cabinet angle and lock to required angle value with 8x20 quick release pins;
•
Position “U” bracket over these side plates; align centre holes;
•
Insert adjustment handles, adjust vertical angle and tight the handles to prevent GEO S12s from
rotating around “U” bracket;
Cable suspension:
•
Connect lifting ring GEOS12-XHBRK to “U” bracket by inserting 8x45 quick release pin dedicated
holes;
•
Ensure lifting ring is properly locked to “U” bracket;
•
Connect assembly to suspension point with sling and shackle (not provided).
Truss suspension
•
Connect truss hook GEOS12-TCBRK-V2 to “U” bracket by inserting 8x45 quick release pin in
dedicated holes;
•
Ensure truss hook is properly locked to “U” bracket;
•
Lift and position assembly, lock hook on truss suspension point and secure with hook cable.
Summary of Contents for GEO S12 Series
Page 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Page 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...