Page 44/112
GEO
S12
HARDWARE SETUP PROCEDURE
•
(7) Flip the cluster upside down to access connector plates located on the down side;
•
(8) Repeat all above steps from #2 to #6;
•
(9) Position the two “U” brackets from GEOS12-ABRK kits on the outer cabinets next the angle
plates, and tight them to the cabinets using the shoulder screws provided with these kits,
•
(10) Four screws 12mm diameter (not provided) are required to secure the “U” brackets under
the ceiling;