Page 56/112
GEO
S12
HARDWARE SETUP PROCEDURE
3.15°
2.0°
1.25°
0.8°
0.5°
0.315°
0.2°
5.0°
6.3°
8.0°
10.0°
LI
F
T
16.0°
22.5°
30.0°
LIF
T
CAUTION: ENSURE ALL PINS
ARE PROPERLY LOCKED
PROFESSIONAL EQUIPMENT !
Please refer to User Manual for Working
Load Limits (WLL) and Rigging
Instructions.
WARNING
Disregard of Rigging Instructions and/or
WLL may damage equipment and risk
personal injury or death.
SA
FE
TY
PIN
MUS
TB
EF
IT
TE
D
8.4.7 Two or more GEO S12 flown vertically
Required items
•
N Pair of Rigging Plates (GEOS12-XBOW-V2) for N cabinets;
•
1 lifting ring (GEOS12-XHBRK) every two GEO S12;
•
4xN Quick release pins for N cabinets;
•
Properly rated slings, shackles, hoists… (not provided)
IMPORTANT
Lifting ring GEOS12-XHBRK and truss hook GEOS12-TCBRK-V2 are rated for a maximum
of 2 GEO S12s;
Ensure that suspension points are rated accordingly.
Procedure
•
Insert GEOS12-XBOW-V2 into connecting plates of both sides of the cabinet;
•
Lock safety pins into GEO S12s connecting plate;
IMPORTANT
Ensure that safety pins are properly locked into GEO S12s connecting panels.
Summary of Contents for GEO S12 Series
Page 48: ...Page 48 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 52: ...Page 52 112 GEO S12 HARDWARE SETUP PROCEDURE ...
Page 54: ...Page 54 112 GEO S12 HARDWARE SETUP PROCEDURE DOWN CABINET UP CABINET ...
Page 66: ...Page 66 112 GEO S12 HARDWARE SETUP PROCEDURE ...