Page 1: ...J355HA M30 P1 ...

Page 2: ...Copyright FAAC S p A ab dem 2015 Alle Rechte vorbehalten Kein Teil dieses Handbuchs darf reproduziert gespeichert an Dritte weitergegeben oder sonst auf eine beliebige Art in einem beliebigen Format und mit beliebigen Mitteln kopiert werden weder mit elektronischen noch mechanischen oder durch Fotokopieren ohne die Genehmigung von FAAC S p A Alle erwähnten Namen und Marken sind Eigentum der jeweil...

Page 3: ...se of at least one indicator light i e flashing lamp incorporated in the bollard head is recommended for every system as well as a warning sign adequately secured 17 FAAC declines all liability as concerns safety and efficient operation of the automated system if system components not produced by FAAC are used 18 For maintenance strictly use original parts by FAAC 19 Do not in any way modify the c...

Page 4: ...M30 P1 This model refers to anti terrorist automatic hydraulic traffic bollards The cylinder is driven by a two motor hydraulic unit fixed inside the structure 1 LED Flashing lamp 2 Crown 3 Cylinder 4 Magnetic contacts up N C polarity 5 4 stop points up 6 Oil filler plug with level rod 7 Two motor hydraulic unit 8 Junction box 9 Magnetic contact down N C polarity 10 4 stop points down 11 Ø 100 mm ...

Page 5: ...ime using EFO sec 1 5 Minimum lowering time sec 2 Operating ambient temperature C 15 55 Weight bollard and pit kg 490 bollard 250 pit Oil quantity l 1 3 Protection class IP66 Overall dimensions See Fig 2 Capacitor 2 2 x 20µF 400V Burglar proofing J 3 656000 1 check the oil level using the rod attached to the filler plug Fig 1 ref with the piston rod completely retracted and pressurised EFO system ...

Page 6: ... 610 900 900 3 Translation of the original instructions ENGLISH 2 INSTALLATION 2 1 FACILITIES For draining use a Ø 100 flexible tube Dig up to a depth of about 1 8 m Dimensions in mm UNPROTECTED AREA IMPACT DIRECTION PROTECTED AREA Ground Excavation ...

Page 7: ...he original instructions ENGLISH Dimensions in mm 2 2 PREPARING THE FOUNDATION CAGE Prepare the foundation cage not supplied by us as shown in the figure below using Ø 12 mm iron rods CLASS B450C REBARS REBARS REBARS REBARS REBARS REBARS NET WELDED ...

Page 8: ...he cage to secure it properly up to approximately 10 cm from the tread area Wait at least 7 days for the concrete to set correctly and finish the road surface using the same type of material Lay the pipelines that are necessary for the connection between the control unit and any additional device if any Prepare the electrical connection and the earthing To connect the bollard to the control board ...

Page 9: ...he bollard must be installed after at least 7 days of concrete setting The compacting index of the surrounding ground must be at least 90 of the Proctor optimum curve according to UNI EN 13286 2 2005 standard The steel framework must comply with class B450C ASTM A615 Grade 60 During the concrete maturation phase insert one or more contrast supports inside the pit to prevent inwards deformation of ...

Page 10: ... with max length of 50 m This cable must be laid inside a sheath ø 45mm secured to the cable clamp in the bottom part of the frame fig 8 ref and must come out of the pit by 2 5 m Perform the electric wiring in the junction box on the bollard side as shown in Fig 13 Any additional accessory i e photocells opening closing push buttons etc that have to be connected to the control unit must compulsori...

Page 11: ...afety devices see JE275 ELECTRONIC EQUIPMENT on page 11 Lift and insert completely the bollard in the pit During this phase ensure the cable is positioned correctly to prevent it from being crushed between the pit and the bollard frame After completely inserting the bollard and resting it on the pit counter frame remove the two eyebolts and secure the bollard to the pit using the 15 provided cylin...

Page 12: ...cylindrical head screws with hexagon socket M8x30 securing the upper crown Fig 12 ref 2 Remove the upper crown Fig 12 ref 3 Insert the key supplied in the hole and rotate it one turn anticlockwise to lower the bollard Fig 12 ref 2 9 AUTOMATIC OPERATION To restore the automatic operation 1 Insert the key in the hole and rotate clockwise all the way down 2 Refit the upper crown 3 Tighten the 8 cylin...

Page 13: ... technician The equipment must be laid at a height ranging between 0 4 m and 2 0 m 3 1 ELECTRICAL CONNECTIONS BOLLARD SIDE JE275 BOARD SIDE Lights Motor 1 Motor 2 Limit switch DOWN Limit switch UP Lights Motor Brown Motor Blue Motor Black 24V Limit switch UP Limit switch DOWN 3 2 PRE SETTING SELECTION After having connected the board and after having supplied it with power according to the previou...

Page 14: ...LOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 OUT 4 GND OPENA STOP LOOP 1 LOOP 2 LOOP 2 LOOP 1 CLOSE FSW EMERGENCY OUT 1 OUT 2 OUT 3 GND GND 24 V 24 V OUT 3 MOT1 COM MOT2 COM COM LAMP FAN 3 7 11 13 J5 J3 14 JE275 MASTER JE275 SLAVE JE275 SLAVE A A 1 2 n Translation of the original instructions ENGLISH 3 3 CONNECTION OF SEVERAL BOLLARDS MASTER SLAVE Several bollards can be commanded ...

Page 15: ...r The LED flashing lamp does not operate Make sure you have selected the default no 6 on the JE275 board Check if the power connector under the head was fitted correctly 4 PERFORMING MAINTENANCE ON THE EFO SYSTEM The EFO system tank is always under pressure Before carrying out any maintenance operation to avoid potentially dangerous situations the circuit must be discharged before any other operat...

Page 16: ...FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 758518 www faac it www faacgroup com J355HA M30 P1 16 732768 Rev C ...