J355HA M30-P1
3
732768 - Rev.C
Tr
ansla
tion of the original instruc
tions
ENGLISH
CE DECLARATION OF CONFORMITY FOR MACHINES
(DIRECTIVE 2006/42/EC)
WARNINGS FOR THE INSTALLER
GENERAL SAFETY OBLIGATIONS
1. ATTENTION! To ensure the safety of people, it is important that you read
all the following instructions. Incorrect installation or incorrect use of the
product could cause serious harm to people.
2. Carefully read the instructions before beginning to install the product.
3. Do not leave packing materials (plastic, polystyrene, etc.) within reach of
children as such materials are potential sources of danger.
4. Store these instructions for future reference.
5. This product was designed and built strictly for the use indicated in this do-
cumentation. Any other use, not expressly indicated here, could compromise
the good condition/operation of the product and/or be a source of danger.
6. FAAC declines all liability caused by improper use or use other than that for
which the automated system was intended.
7. Do not install the equipment in an explosive atmosphere: the presence of
inflammable gas or fumes is a serious danger to safety.
8. FAAC is not responsible for failure to observe Good Technique in the con-
struction of the closing elements to be motorised, or for any deformation
that may occur during use.
9. Installation must be performed in compliance with current Standards.
10. Before attempting any job on the system, cut out electrical power.
11. The mains power supply of the automated system must be fitted with an
all-pole switch with contact opening distance of 3 mm or greater. Use of a
6A thermal breaker with all-pole circuit break is recommended.
12. Make sure that a differential switch with threshold of 0.03 A is fitted
upstream of the system.
13. Make sure that the earthing system is perfectly constructed and connect
metal parts of the closure to it.
14. The automated system is supplied with an intrinsic anti-crushing safety
device consisting of a torque control. Nevertheless, its tripping threshold
must be checked as specified in the Standards indicated at point 10.
15. The safety devices (EN 12978 standard) protect any danger areas against
mechanical movement Risks, such as crushing, dragging, and shearing.
16. Use of at least one indicator-light (i.e. flashing lamp incorporated in the
bollard head) is recommended for every system, as well as a warning sign
adequately secured.
17. FAAC declines all liability as concerns safety and efficient operation of the
automated system, if system components not produced by FAAC are used.
18. For maintenance, strictly use original parts by FAAC.
19. Do not in any way modify the components of the automated system.
20. The installer shall supply the user with the necessary information for the
manual operation of the system in the event of emergency.
21. Do not allow children or adults to stay near the product while it is operating.
22. Keep remote controls or other pulse generators away from children, to
prevent the automated system from being activated involuntarily.
23. Transit on the bollard is permitted only when the device is completely down.
24. The user must not attempt any kind of repair or direct action whatever and
contact qualified personnel only.
25. Anything not expressly specified in these instructions is not permitted.
Manufacturer: FAAC
S.p.A.
Address:
Via Calari, 10 - 40069 Zola Predosa BOLOGNA - ITALY
Declares that:
The operator mod. J355HA M30-P1
is built to be integrated into a machine or to be assembled with other machinery to create a machine under the provisions of
Directive 2006/42/EC
conforms to the essential safety requirements of the following EEC directives
2006/95/EC
Low
Voltage
Directive
2004/108/EC
Electromagnetic Compatibility Directive
and also declares that it is prohibited to put into service the machinery until the machine in which it will be integrated or of which
it will become a component has been identifi ed and declared as conforming to the conditions of Directive 2006/42/EEC and
subsequent amendments.
Bologna,
01
st
January 2015
CEO
A.
Marcellan
CONTENTS
1. J355HA M30-P1 BOLLARD
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
1.1 General notes
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
1.2 Description and technical specifications
. . . . . . . . . . . . . . . . . . . . . . .
4
1.3 Dimensions
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5
2. INSTALLATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6
2.1 Facilities
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6
2.2 Preparing the foundation cage
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7
2.3 Securing the pit
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8
2.4 Electric wiring
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10
2.5 Inserting the bollard in the pit
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11
2.6 Fastening the top crown
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11
2.7 EFO (optional)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12
2.8 Manual release (optional)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12
2.9 Automatic operation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12
2.10 Maintenance
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12
3. JE275 CONTROL UNIT
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13
3.1 Electrical connections
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13
3.2 Pre-setting selection
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13
3.3 Connection of several bollards (master/slave)
. . . . . . . . . . . . . . .
14
3.4 Troubleshooting
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15
4. PERFORMING MAINTENANCE ON THE EFO SYSTEM
. . . . .
15
Summary of Contents for J355HA M30-P1
Page 1: ...J355HA M30 P1 ...