
J355HA M30-P1
6
732768 - Rev.C
1800
1600
3200
800
610
900
900
3
Tr
ansla
tion of the original instruc
tions
ENGLISH
2. INSTALLATION
2.1 FACILITIES
For draining, use a Ø 100 flexible tube. Dig up to a depth of about 1.8 m
Dimensions in mm
UNPROTECTED AREA
IMPACT DIRECTION
PROTECTED AREA
Ground
Excavation
Summary of Contents for J355HA M30-P1
Page 1: ...J355HA M30 P1 ...