7-8 Installing Options
5.
Firmly push the power unit.
The power unit is locked when a "click" is heard.
6.
Connect the power cord.
The AC POWER lamp starts blinking green if the power of EcoPowerGateway is off.
The AC POWER lamp goes on green if the power of EcoPowerGateway is on.
7.
Confirm, by the STATUS lamp or on the management tool (e.g., NEC ESMPRO
Manager) installed on management PC connected with the EcoPowerGateway, that there
are no errors related to the power unit.
8.
You can remove the power unit in reverse order of installation procedure.
9.
Remove the power unit in reverse order of installation procedure.
Summary of Contents for EcoPowerGateway N8142-36F
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ... This page is intentionally left blank ...
Page 16: ...vi This page is intentionally left blank ...
Page 21: ...Notes on Using Your EcoPowerGateway 1 5 ...
Page 23: ...Notes on Using Your EcoPowerGateway 1 7 ...
Page 26: ...1 10 Notes on Using Your EcoPowerGateway ...
Page 29: ...Notes on Using Your EcoPowerGateway 1 13 ...
Page 38: ...1 22 Notes on Using Your EcoPowerGateway This page is intentionally left blank ...
Page 56: ...2 18 General Description This page is intentionally left blank ...
Page 136: ...A 2 Specifications This page is intentionally left blank ...