![Nautel NX5 AM Operation & Maintenance Manual Download Page 15](http://html1.mh-extra.com/html/nautel/nx5-am/nx5-am_operation-and-maintenance-manual_711218015.webp)
NX5 OPERATION & MAINTENANCE MANUAL
DESCRIPTION
VERSION 0.1 2015-08-01
PAGE 3.1.7
RF Power Stage
and electrical schematic
SD-4
. The RF power stage contains two RF
power modules (A12 and A13) two fan tray assemblies (A16 and A17), power module interface PWB
(A10), rack interface PWB (A9) and RF combiner transformer (A21).
Each RF power module accepts RF drive from the rack interface PWB through the power module
interface PWB and PDM from the exciter stage. B+ and +15 V dc voltages are applied to the RF power
modules via the B+ distribution assembly, the rack interface PWB and power module interface PWB.
+48 V dc voltage is applied to the fan trays via the rack interface PWB and the power module interface
PWB. The output of each RF power module is applied to a primary winding of a series combining
transformer. The resultant combined output is applied to the RF output network.
Each RF power module also:
monitors the tachometer signals from the two fans on its associated fan tray - applied through
the power module interface PWBs - and will shut down if one of the fans fail.
controls its associated RF relay on the power module interface PWB, ensuring the relay is
closed when the RF power module is disabled, allowing combiner current to continue flowing
in the primary of its associated combiner transformer.
provides status information to the rack interface PWB over a serial bus connection.
Summary of Contents for NX5 AM
Page 2: ......
Page 4: ......
Page 8: ...NX5 OPERATION MAINTENANCE MANUAL PAGE 3 VIII VERSION 0 1 2015 08 01 ...
Page 216: ...NX5 OPERATION MAINTENANCE MANUAL ROUTINE MAINTENANCE PAGE 3 3 12 VERSION 0 1 2015 08 01 ...
Page 219: ......