9.22.2 Install the Feed Block
CAUTION
Tightening the screws incorrectly can result in uneven clamping of the
barrel and may cause damage to the machine.
Do not reuse purged pellets. Damage to the E-Multi injection unit from
contaminated pellets is not covered under warranty.
CAUTION
1. Install the feed block into barrel housing.
2.
Apply a light coat of synthetic grease to the screws, install and finger
tighten.
3. In a cross pattern, torque the screws in steps, ensuring that the gap for
the entire contact surface remains uniform as the screws are tightened.
See Table 9-2 for torque specifications.
Gap to be uniform for
entire contact surface
4. Connect the water cooling lines.
5.
Reinstall the vibrator and torque. See Table 9-2 for torque specifications.
6. For vertical installations, reinstall feed tube and torque screws.
7. Reinstall the feed hopper.
8. Reconnect the feed connections and water cooling hoses.
9. Replace the guards.
9-29
MAINTENANCE
E-Multi User Manual
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.