c) Torque to the full recommended torque setting, following the same
order as shown. See “9.2 Screw Torque Specifications” on page 9-1.
6. Install the lower end of both cable tracks and connect the water and air
lines.
7. Release the orange X-Axis brake and slide the unit back until it is
balanced and stable.
8. Remove the lifting slings. Attach the appropriate lifting devices to the hole
at the top of the E-Multi Radial vertical beam.
E-Multi Radial Installation (EM1 and EM2 Models) -
continued
11-8
E-Multi User Manual
E-MULTI RADIAL OPTION
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.