10. Tighten bolts lightly so adapter plate can be moved by tapping with a
rubber mallet.
11. Measure the distance from the nozzle to the adapter plate bore at 12, 3,
6 and 9 o’clock and align the plate by tapping so the distance is equal at
all positions. Then torque adapter plate screws. See “9.2 Screw Torque
12. Set correct nozzle protrusion for the mold being used. See “Nozzle
Protrusion Adjustment - Toggle Link Models” on page 9-13. When
protrusion is correct, tighten the clamping screw to the proper torque. See
“Table 9-2 Screw Torque Specifications” on page 9-1.
3
2
1
1. Nozzle tip
2. Adapter plate
3. Nozzle protrusion
13. Manually retract the nozzle past the adapter plate using the carriage
motor manual adjusting screw to allow installation onto the mold.
14. Replace the linear actuator manual access port cover and hand tighten.
The E-Multi injection unit is ready to install onto the molding machine.
9-12
E-Multi User Manual
MAINTENANCE
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.