- 95 -
[
VII
Control ]
(2) Heating operation (For warming up the indoor unit)
Heating operation
Test run mode
ON
Thermostat ON
Defrost
operation
3-minute restart
prevention
*Note 1,2
*Note 1,2
*Note 4
YES
YES
YES
YES
YES
NO
NO
NO
NO
NO
1. Indoor/outdoor unit fan control
2. Inverter frequency control
3. Indoor unit LEV, LEV1 control
4. Solenoid valve control
5. 52C control
Normal operation
Defrost operation
4-way valve ON
During test run mode
1. Indoor fan operation
2. Inverter output 0Hz
3. Indoor unit LEV, LEV1 Fully closed
4. All solenoid valves OFF
5. Outdoor unit fan stop
6. 52C OFF
4-way valve OFF
Stopping the
defrost operation
Stopping the defrost
operation
Return to heating
operation
1. Indoor unit fan stops (*Note.3)
2. Inverter defrost frequency control
3. Indoor unit LEV fully closed.
4. Solenoid valve control
5. Outdoor unit fan stop
6. SC coil LEV control
7. 52C control
*Note 1. When outdoor unit starts defrosting, it transmits defrost operations command to indoor unit, and the indoor unit starts
defrosting operations. Similarly when defrosting operation stops, indoor unit returns to heating operation after receiving
defrost end command of outdoor unit.
*Note 2. Defrost end condition: 10 or more minutes must pass after defrost operation.
or
Outdoor unit piping temperature: refer to "-5-. Defrost operation control" of [2] Controlling the Outdoor Unit.
*Note 3. Refer to "-5-. Defrost operation control" of [2] Controlling the Outdoor Unit for indoor fan control.
*Note 4. The discharge temperature is controlled to keep approx. 30 C or below in heating mode.
Unit in the stopped state
Summary of Contents for PU(H)Y-P250YGM-A
Page 9: ......
Page 11: ... 2 ...
Page 23: ... 14 ...
Page 25: ... 16 ...
Page 41: ... 32 ...
Page 53: ... 44 ...
Page 67: ... 58 ...
Page 73: ... 64 ...
Page 81: ... 72 ...
Page 83: ... 74 ...
Page 105: ... 96 ...
Page 107: ... 98 ...
Page 117: ... 108 ...
Page 119: ... 110 ...
Page 183: ... 174 ...