Operation
Points to check prior to starting operation
4 - 2
●
24VDC or higher voltages are not applied to the pins of connector CN3.
●
SD and SG of connector CN3 are not shorted.
●
The connection cable are not under a mechanical load (tension or excessive bend etc.).
●
CN1A should be connected with the bus cable connected to the servo system controller or
preceding axis servo amplifier, and CN1B should connected with the bus cable connected
to the subsequent axis servo amplifier or with the termination connector (MR-A-TM.)
Station number
The station number setting of CS1 should be the same as that of the servo system controller.
Parameter
Check the parameter setting on the servo system controller screen or using the setup-software.
Environment
Before starting operation, check the following:
●
Signal cables and power cables are not shorted by wire offcuts, metallic dust or the like.
S000583C
Fig. 4-3:
Short-circuit of SD and SG
SD
SG
Servo amplifier
Summary of Contents for MELSERVO MRJ2S-B
Page 2: ......
Page 4: ......
Page 6: ......
Page 14: ...VIII ...
Page 18: ...Contents XII ...
Page 48: ...Introduction System configuration 1 30 ...
Page 58: ...Installation General environmental conditions 2 10 ...
Page 86: ...Connection Station number setting 3 28 ...
Page 122: ...Operation Gain 4 36 ...
Page 134: ...Absolute position detection system General description 6 6 ...
Page 146: ...Accessories Special accessories 7 12 ...
Page 148: ...Maintenance and Inspection Life 8 2 ...
Page 174: ...Specifications Standard specifications 10 16 ...
Page 176: ...EMC Directives Requirements 11 2 ...
Page 198: ...Index iv ...
Page 199: ......