Procedures before operation
MELSEC-WS
66
(1) Procedures before operation
(a) Communications with the QJ71E71-100
The following is a procedure to establish communications between the WS0-
GETH and the QJ71E71-100.
Procedure before operation
Connect the WS0-GETH
to the MELSEC-WS
CPU module.
Connect an Ethernet cable.
Configure configuration
data with Setting and
Monitoring Tool.
Write the configuration
data to the module
with Setting and
Monitoring Tool.
End
Mount the QJ71E71-100
on the base unit.
Configure network
parameters (for Ethernet)
with GX Developer.
Connect an Ethernet cable.
Create a ladder program.
Check operations.
QJ71E71-100
*1
*1 For details, refer to the Q Corresponding Ethernet Interface Module User's Manual (Basic).
WS0-GETH
Execute a PING test
to check for existence
of the WS0-GETH.
8. Procedures before operation
Figure 29:
Procedure before
operation
(communications with
the QJ71E71-100)
Summary of Contents for Melsec WS Series
Page 1: ...Safety Controller Ethernet Interface Module User s Manual WS0 GETH ...
Page 2: ......
Page 89: ...Procedures before operation MELSEC WS 86 ...
Page 90: ...MELSEC WS Procedures before operation 87 ...
Page 91: ...Procedures before operation MELSEC WS 88 ...
Page 97: ...Procedures before operation MELSEC WS 94 ...
Page 98: ...MELSEC WS Procedures before operation 95 ...
Page 99: ...Procedures before operation MELSEC WS 96 ...
Page 141: ......