© 2011 MIMAKI ENGINEERING CO.,LTD.
1.1.2
P.1
MAINTENANCE MANUAL > Operating Principle > Basic Operation > Sub Switch Power ON
Model
TS34-1800A
Issued 2011.10.17 Revised
F/W ver.
1.20
Remark
1.0
R.1.0
1.1.2 Sub Switch Power ON
Indication on LCD
Processing sequence
Step
Processing
Description
Indication
on LCD
1
Initial setting of CPU and H/W
2
Display at sub switch power ON
1. [PLEASE WAIT] is displayed.
3
Voltage check
1. Check the power supply voltage on the main PCB assy.
• In the malfunction, [ERROR03 POWER **V] is displayed and the
system goes down.
4
FPGA setting
1. Execute the configuration of PDC and HDC.
• In the malfunction, [ERROR09 FPGA ERROR] is displayed and
the system goes down.
• When the fuse F13 of the main PCB assy is blown, the system shuts
down, displaying [ERROR205 42V HEAD VOLTAGE].
5
Version information display
1. Machine model name and main body firmware version are displayed.
2. “Revision” and “Boot/PDC/HDC version” are also displayed during
the service mode.
3. Special key function is workable during the version information is
being displayed. (Except firmware update)
6
Initial operation of the machine
1. See
"1.1.3 Initial Machine Operation"
P L EA S E W A I T
T S 3 4 - 1 80 0 A
V*.**
TS 3 4 - 1 8 00 A
V*.**.0
B*.* *P*.**H**.**
B: B o o t , P : P D C , H : H D C
Display at sub switch power ON
Version information display
Version information display
(during the service mode)