Page 4-1
Chapter 4: Operating Procedures
|
Section 4.1: Start Up
Chapter 4: Operating Procedures
Section 4.1: Start Up
1. Insure that all cabinet doors are closed and locked.
2. Insure that all safety guards are in place.
3. Plug machine into proper electrical outlet, or turn on junction box if welder is hard
wired in.
4. Rotate the In Shop Air Supply Valve to the open position.
5. Turn the Circuit Breaker to the on position.
6. Turn the Power Switch to the on position. The internal air compressor should start (on
hot air machines).
7. Turn the Heat Switch to the on position. The Temperature Controller should light up.
8. Adjust the Temperature Controller to the desired temperature. It will take 3-5 minutes
for the machine to reach the desired temperature.
9. Check for the proper alignment of the weld rollers. Make any adjustments necessary.
10. Check for the proper alignment of the fabric guides. Make any adjustments necessary.
11. Turn the Heat Swing Switch to the on position.
12. For Hot Air Machines: When the machine has reached the desired temperature, check
for proper nozzle alignment by engaging the Foot Drive Switch. If aligned properly,
there will normally be a whistling sound created from the airflow hitting the pinch
point of the weld rollers. The nozzle should also be centered left and right. The nozzle
should be spaced 1/4 - 1/2 inch away from the weld rollers.
13. If the Outboard Puller is going to be used, turn the Outboard Puller Switch to the on
position. It is not necessary to turn this off when shutting down.
Summary of Contents for T-100
Page 1: ......