Page 3-2
Chapter 3: Changing Heating Systems
|
Section 3.1: Changing from Hot Air to Hot Wedge
7.
Disconnect the black Hot Air Supply Line by
pushing in the disconnect tab and removing
the line.
(Figure3.6)
8.
Loosen the two screws on the grey plug
located on top of the machine and unplug it.
(Figure3.7)
(Figure3.8)
9.
Carefully remove the Hot Air Heating System
by sliding the entire assembly upward until it
is free.
(Figure3.9)
10. Install the Hot Wedge Heating System
carefully by placing the Heating System
mounting Angle into the slide and sliding the
assembly down until the mounting angle is
against the Height Adjustment Knob.
(Figure3.10)
11. Connect the two grey connectors into the
sockets on top of the machine and tighten
screws finger tight. Note that the connectors
will only fit into their correct socket.
(Figure3.11)
(Figure3.12)
12. Install the Green Air Line into the black y-
fitting by pushing in on the white plug and
sliding the airline into place.
(Figure3.13)
13. Finger tighten the Front Locking Bolt.
(Figure3.14)
14. Change the Weld Rollers to Silicone Weld
Rollers one roller at a time.
15. Align The Wedge See:
Section 2.2 Wedge
Alignment.
Figure 3.6:
Figure 3.7:
Figure 3.8:
Figure 3.9:
Figure 3.10:
Figure 3.11:
Figure 3.12:
Figure 3.13:
Figure 3.14:
Summary of Contents for T-100
Page 1: ......