Save results (optional).
*For more information refer to chapter
Measurements according to IEC/ EN 60974-4
– Primary
Leakage current in 3-phase adapter user manual.
Figure 6.53: Examples of Primary Leakage measurement results
Note:
This test is applicable only with connected METREL 3-phase adapter (A1422).
The differential current measurement principle is used for this test.
6.2.13 Leak's & Power
Figure 6.54
: Leak’s & Power measurement menu
Test results / sub-results
P
............... Active power
Itou
........... Touch Leakage current
Idiff
........... Differential Leakage current
S
............... Apparent power
Q
.............. Reactive power
PF
............. Power factor
THDu
........ Total harmonic distortion
– voltage
THDi
......... Total harmonic distortion
– current
Cos
Φ
....... cosines
Φ
I
................ Load current
U
............... Voltage
Test parameters
Duration
Duration
[Off, 2 s
… 180 s]
Change
Change status
[YES, NO]
YES: The instrument measures leakage current in two sequential steps with
delay* in between. The phase voltage is firstly applied to the right live