
1. Insert new primary
fi
lter element (A) into canister over
secondary element, and push into place, ensuring that
element is
fi
rmly seated in canister.
Figure 5.72: Engine Air Cleaner
2. Align arrow (A) to UNLOCK position on end cap, and
push end cap fully onto housing.
3. Rotate end cap clockwise until catch (A) engages
housing to prevent end cap from turning.
Figure 5.73: Engine Air Cleaner
4. Position end cap (B) onto
fi
lter housing with aspirator
pointing approximately down.
5. Secure end cap onto
fi
lter housing by closing latch (A).
Figure 5.74: Engine Air Cleaner
169890
234
Revision A
Summary of Contents for M105
Page 8: ......
Page 28: ...SAFETY Figure 1 21 Safety Signs LH Side 169890 14 Revision A ...
Page 30: ...SAFETY Figure 1 23 Safety Signs RH Side 169890 16 Revision A ...
Page 40: ......
Page 87: ...OPERATOR S STATION 169890 73 Revision A ...
Page 88: ...OPERATOR S STATION 169890 74 Revision A ...
Page 89: ...OPERATOR S STATION 169890 75 Revision A ...
Page 90: ...OPERATOR S STATION 169890 76 Revision A ...
Page 91: ...OPERATOR S STATION 169890 77 Revision A ...
Page 92: ...OPERATOR S STATION Operating Information Screens 169890 78 Revision A ...
Page 94: ......
Page 299: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 169 Fuse Decal 169890 285 Revision A ...
Page 350: ......
Page 372: ......
Page 382: ......
Page 383: ......