
Attaching an A-Series Header: Hydraulic Center-Link
To attach an A-Series header to a windrower equipped with a hydraulic center-link, follow these steps:
DANGER
Stop engine and remove key from ignition before leaving operator's seat for any reason. A child or even a
pet could engage an idling machine.
1. Remove hairpin (A) from clevis pin (B) and remove
the clevis pin from left and right header boots (C)
on header.
Figure 4.123: Header Boot
CAUTION
To prevent damage to the lift system when lowering
header lift linkages without a header or weight box
attached to windrower, ensure that float engagement
pin is installed in storage location (B) and NOT
installed at hole location (A).
Figure 4.124: Header Lift Linkage
CAUTION
Check to be sure all bystanders have cleared the area.
2. Start the engine and activate HEADER DOWN
button (A) on the ground speed lever (GSL) to fully
retract header lift cylinders.
Figure 4.125: GSL
169890
149
Revision A
Summary of Contents for M105
Page 8: ......
Page 28: ...SAFETY Figure 1 21 Safety Signs LH Side 169890 14 Revision A ...
Page 30: ...SAFETY Figure 1 23 Safety Signs RH Side 169890 16 Revision A ...
Page 40: ......
Page 87: ...OPERATOR S STATION 169890 73 Revision A ...
Page 88: ...OPERATOR S STATION 169890 74 Revision A ...
Page 89: ...OPERATOR S STATION 169890 75 Revision A ...
Page 90: ...OPERATOR S STATION 169890 76 Revision A ...
Page 91: ...OPERATOR S STATION 169890 77 Revision A ...
Page 92: ...OPERATOR S STATION Operating Information Screens 169890 78 Revision A ...
Page 94: ......
Page 299: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 169 Fuse Decal 169890 285 Revision A ...
Page 350: ......
Page 372: ......
Page 382: ......
Page 383: ......