
Checking Self-Locking Center-Link Hook
Periodically check the operation of the hook locking mechanism and ensure that it is working properly as follows:
1. If header is attached to windrower, disconnect
center-link hook from header by pulling up on
handle (A) to release the locking device and then lifting
the hook off the header pin.
Figure 4.72: Center-Link
2. Lower the handle (A) into the
LOCK
position.
3. Push up on lock pin (B) only. Handle should catch on
casting and pin should
NOT
lift.
Figure 4.73: Center-Link Hook
A - Handle
B - Lock Pin
C - Actuator Rod
4. Push up on actuator rod (C) and lock pin should lift with
the handle.
Figure 4.74: Center-Link Hook
169890
126
Revision A
Summary of Contents for M105
Page 8: ......
Page 28: ...SAFETY Figure 1 21 Safety Signs LH Side 169890 14 Revision A ...
Page 30: ...SAFETY Figure 1 23 Safety Signs RH Side 169890 16 Revision A ...
Page 40: ......
Page 87: ...OPERATOR S STATION 169890 73 Revision A ...
Page 88: ...OPERATOR S STATION 169890 74 Revision A ...
Page 89: ...OPERATOR S STATION 169890 75 Revision A ...
Page 90: ...OPERATOR S STATION 169890 76 Revision A ...
Page 91: ...OPERATOR S STATION 169890 77 Revision A ...
Page 92: ...OPERATOR S STATION Operating Information Screens 169890 78 Revision A ...
Page 94: ......
Page 299: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 169 Fuse Decal 169890 285 Revision A ...
Page 350: ......
Page 372: ......
Page 382: ......
Page 383: ......