8. Push down on rod end of link cylinder (B), until hook
engages pin on header and is locked.
IMPORTANT:
Hook release must be down to enable self-locking
mechanism. If the release is open (up), manually push it
down after hook engages header pin.
9. Check that center-link (A) is locked onto header by
pulling upward on rod end (B) of cylinder.
Figure 4.83: Hydraulic Center-Link
CAUTION
Check to be sure all bystanders have cleared the area.
10. Start engine and press the HEADER UP switch (A) to
raise header to maximum height.
NOTE:
If one end of the header does
NOT
raise fully, rephase
the cylinders as follows:
a. Press and hold the HEADER UP switch until both
cylinders stop moving.
b. Continue to hold the switch for 3–4 seconds.
Cylinders are now phased.
Figure 4.84: GSL
169890
133
Revision A
Summary of Contents for M105
Page 8: ......
Page 28: ...SAFETY Figure 1 21 Safety Signs LH Side 169890 14 Revision A ...
Page 30: ...SAFETY Figure 1 23 Safety Signs RH Side 169890 16 Revision A ...
Page 40: ......
Page 87: ...OPERATOR S STATION 169890 73 Revision A ...
Page 88: ...OPERATOR S STATION 169890 74 Revision A ...
Page 89: ...OPERATOR S STATION 169890 75 Revision A ...
Page 90: ...OPERATOR S STATION 169890 76 Revision A ...
Page 91: ...OPERATOR S STATION 169890 77 Revision A ...
Page 92: ...OPERATOR S STATION Operating Information Screens 169890 78 Revision A ...
Page 94: ......
Page 299: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 169 Fuse Decal 169890 285 Revision A ...
Page 350: ......
Page 372: ......
Page 382: ......
Page 383: ......