CAUTION
Check to be sure all bystanders have cleared the area.
17. Start engine and activate HEADER DOWN switch (A)
on GSL to lower header fully.
Stop engine and
remove key.
Figure 4.149: GSL
18. Connect header drive hoses (A) and electrical
harness (B) to header. Refer to the auger header
operator’s manual.
Figure 4.150: Header Drive Hoses and Harness
4.5.4
Detaching an A-Series Header
Refer to the procedure that is appropriate for the center-link installed on the windrower:
•
Detaching an A-Series Header: Hydraulic Center-Link, page 160
•
Detaching an A-Series Header: Mechanical Center-Link, page 163
169890
159
Revision A
Summary of Contents for M105
Page 8: ......
Page 28: ...SAFETY Figure 1 21 Safety Signs LH Side 169890 14 Revision A ...
Page 30: ...SAFETY Figure 1 23 Safety Signs RH Side 169890 16 Revision A ...
Page 40: ......
Page 87: ...OPERATOR S STATION 169890 73 Revision A ...
Page 88: ...OPERATOR S STATION 169890 74 Revision A ...
Page 89: ...OPERATOR S STATION 169890 75 Revision A ...
Page 90: ...OPERATOR S STATION 169890 76 Revision A ...
Page 91: ...OPERATOR S STATION 169890 77 Revision A ...
Page 92: ...OPERATOR S STATION Operating Information Screens 169890 78 Revision A ...
Page 94: ......
Page 299: ...MAINTENANCE AND SERVICING Fuse Box Decal Figure 5 169 Fuse Decal 169890 285 Revision A ...
Page 350: ......
Page 372: ......
Page 382: ......
Page 383: ......