214778
20
Revision A
1017833
A
Figure 3.8: Hose Management Arm in Shipping
Position
–
12.2
–
13.7 m (40
–
45 ft.) Headers
11.
12.2
–
13.7 m (40
–
45 ft.) Headers:
With the sling attached to
the lifting device and supporting the hose management
arm, cut and remove the wire (A) that secures the hose
management arm to channel latch on top of header
frame tube.
1016797
A
Figure 3.9: Hose Management Arm in Field Position
12. With the help of the sling and lifting device, position the
hose management arm (A) as shown.
NOTE:
Sling not shown in illustration.