
214778
18
Revision A
1020177
A
B
C
Figure 3.3: Hydraulic Hose Management Arm in
Shipping Position
NOTE:
Hydraulic hoses were removed from the illustrations in this
procedure for clarity.
3.
Position a sling (A) between the gas spring cylinder (B) and
secure around the support arm (C).
NOTE:
Illustration shows hydraulic hose management arm in
shipping position for a 7.6
–
10.6 m (25
–
35 ft.) header.
4.
Attach sling (A) to forklift or lifting device.
1027043
A
B
D
C
Figure 3.4: Hydraulic Hose Management Arm In
Shipping Position
–
4.6 m (15 ft.) and 6.1 m (20 ft.)
Headers
5.
4.6 m (15 ft.) and 6.1 m (20 ft.) Headers:
With the sling
attached to the lifting device and supporting the hose
management arm (A), lift the hydraulic hose management
arm (A) out of the inboard shipping stand (B) and remove
the two bolts and nuts (C) securing shipping stand (B) to
center anchor (D). Retain hardware.
NOTE:
Sling not shown in illustration.
1020180
E
B
C
A
D
D
Figure 3.5: Hydraulic Hose Management Arm
Base Frame
–
7.6
–
10.6 m (25
–
35 ft.) Headers
6.
7.6
–
10.6 m (25
–
35 ft.) Headers:
Remove the two bolts and
nuts (A) securing the base of the hose management arm (B)
to the frame channel (C). Retain bolts and nuts for use later.
7.
Remove the other two bolts and nuts (D) from the shipping
plate (E). Retain bolts and nuts for use later. Discard
shipping plate (E).