214778
19
Revision A
1027044
A
B
B
B
B
C
D
D
E
E
C
Figure 3.6: Hydraulic Hose Management Arm In
Shipping Position
–
4.6 m (15 ft.) and 6.1 m (20 ft.)
Headers
8.
4.6 m (15 ft.) and 6.1 m (20 ft.) Headers:
With the sling
attached to the lifting device and supporting the hose
management arm (A), remove the two bolts and nuts (B)
securing the hose management arm to outboard shipping
support (C). Retain hardware.
NOTE:
Sling not shown in illustration.
9.
Remove bolts and nuts (D) securing shipping support (C) to
the frame channel (E). Discard shipping support (C).
1020181
A
C
B
Figure 3.7: Hydraulic Hose Management Arm in
Shipping Position
–
7.6
–
10.6 m (25
–
35 ft.) Headers
10.
7.6
–
10.6 m (25
–
35 ft.) Headers:
With the sling attached to
the lifting device and supporting the hose management
arm (A), remove the two bolts and nuts (B) that secure the
hose management arm to the shipping support (C).