
214778
21
Revision A
1017806
A
B
Figure 3.10: Hose Management Arm Plate Support
13. Secure the plate support (A) to the frame channel (B) using
the four bolts and nuts previously removed.
14. Remove sling from the hose management arm.
1020182
C
B
A
Figure 3.11: Hose Management Arm Shipping Support
Bracket
–
7.6
–
10.6 m (25
–
35 ft.) Headers
15.
7.6
–
10.6 m (25
–
35 ft.) Headers:
Remove the two bolts (A)
and shipping support (B) from the coupler holder (C).
Discard shipping support (B) and reinstall the two bolts at
the same location on the coupler holder to secure the
hose cover.
1024557
A
B
C
Figure 3.12: Hose Management Arm Hose Routing
(Top View)
16. Connect harness connector (C) to the bulkhead on the
header
’
s coupler holder.
17. Cut the cable tie securing the hoses in position (A), and
secure the hoses with the strap (B) bolted on the frame.
IMPORTANT:
Note the routing of the hoses in the hose management arm
field position shown at right.