214778
17
Revision A
Chapter 3:
Attaching Header to Windrower
Perform all the procedures in this chapter in the order in which they are listed.
3.1
Installing the Hydraulic Hose Management Arm
The hydraulic hose management arm should be properly installed from shipping position to working position. Lifting
equipment is required to complete this task; the hydraulic hose management arm weighs approximately 54 kg (120 lb.).
1024555
A
B
Figure 3.1: Hoses and Connector Attached to
the Header
1.
Disconnect harness connector (A) from the header
’
s
coupler holder (B).
NOTE:
The harness connector must be disconnected from the
header prior to moving the hose management arm to field
position.
1017826
A
B
C
Figure 3.2: Hydraulic Hose Management Arm
2.
Cut and remove the wire (A) securing the hydraulic hose
management arm (B) to the diagonal brace (C).