30-49
SK714-5 SK815-5 SK815-5 turbo
REMOVAL OF THE FINAL DRIVE
1 - Disconnect the gearing chains (1) from the final drive
(2). (For details, see “REMOVAL OF WHEEL HUB”).
2 - Remove the complete hydraulic pump. (For details, see
“REMOVAL OF HYDRAULIC PUMP”).
3 - Disconnect from the final drive (2) the supply pipes (3),
the speed increment pipe (4) and the drainage pipe (5).
★
Plug the tubes to prevent entry of impurities.
4 - Attach the final drive (2) to some hoisting tackle and ap-
ply a slight tension to the ropes.
5 - Loosen the 10 screws (6) and take out the complete final
drive (2).
★
Check the condition of the O-ring (7) and substitute
a new one if necessary.
Final drive: 54 kg
RKSA0820
1
2
RKSA0830
2
3
4
5
RKSA0840
2
RKSA0850
2
6
7
REMOVAL AND INSTALLATION
FINAL DRIVE
Summary of Contents for SK714-5
Page 1: ...WEBM005500 ...
Page 2: ......
Page 3: ...SK714 5 SK815 5 SK815 5 turbo WEBM005500 00 1 ...
Page 18: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 104: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 108: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 118: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 172: ......
Page 174: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 253: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 256: ......
Page 257: ......
Page 258: ...2003 ...