30-45
SK714-5 SK815-5 SK815-5 turbo
REMOVAL OF THE HUB WHEEL
1 - Place the machine on blocks that are high enough to
raise the wheels from the ground, and fully raise the
working equipment.
2 - 2 – Loosen the nuts (1) and take off the tire (2).
3 - Loosen the drainage plug (3) in order to drain the chain-
gearing lubrication oil.
Gear-box oil: max. 14.4
★
To facilitate oil drainage, remove the vent plug (4).
4 - Loosen the nuts (5) and take off the cover (6).
★
Check the condition of the seal (7) and install a new
one if necessary.
RKS01750
RKSA0730
1
2
1
RKSA1190
4
3
RKSA0740
7
5
6
5
2
REMOVAL AND INSTALLATION
HUB WHEEL
Summary of Contents for SK714-5
Page 1: ...WEBM005500 ...
Page 2: ......
Page 3: ...SK714 5 SK815 5 SK815 5 turbo WEBM005500 00 1 ...
Page 18: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 104: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 108: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 118: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 172: ......
Page 174: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 253: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 256: ......
Page 257: ......
Page 258: ...2003 ...