30-27
SK714-5 SK815-5 SK815-5 turbo
INSTALLATION OF THE RADIATOR GROUP
•
To install, reverse removal procedure.
1 - Fill up the hydraulic oil to maximum level.
Hydraulic oil: approx. 27
2 - Fill up the coolant liquid circuit to maximum level.
Coolant liquid: approx. 9
3 - Start the engine to circulate the oil and the coolant, and
check that there are no leaks.
4 - Stop the engine, check the levels and, if necessary, top
them up.
Screws: 190 Nm
5 - Pressurise the tank and bleed the air from all circuits.
(For details, see «20. TESTING AND ADJUST-
MENTS»).
1
2
REMOVAL AND INSTALLATION
RADIATOR GROUP
Summary of Contents for SK714-5
Page 1: ...WEBM005500 ...
Page 2: ......
Page 3: ...SK714 5 SK815 5 SK815 5 turbo WEBM005500 00 1 ...
Page 18: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 104: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 108: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 118: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 172: ......
Page 174: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 253: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 256: ......
Page 257: ......
Page 258: ...2003 ...