30-37
SK714-5 SK815-5 SK815-5 turbo
INSTALLATION OF THE ENGINE-PUMP GROUP
•
To install, reverse removal procedure.
1 - Fill the hydraulic oil tank up to maximum level.
While filling the tank, bleed the air from the pump. (For
details, see «20. TESTING AND ADJUSTMENTS»).
Hydraulic oil: approx. 39
2 - Fill the coolant liquid circuit up to maximum level.
Coolant liquid: approx. 9
3 - Fill the fuel tank and bleed the air from the system. (For
details, see «20. TESTING AND ADJUSTMENTS»).
Fuel:
SK714-5 SK815-5: max. 38
SK815-5 turbo: max. 50
4 - Start the engine to circulate the oil and coolant liquid and
check that there are no leaks.
5 - Stop the engine, check the levels and, if necessary, top
them up.
6 - Bleed the air from the hydraulic circuits and pressurise
the tank. (For details, see «20. TESTING AND AD-
JUSTMENTS»).
★
Adjust the stroke of the accelerator cables.
(For details, see «20. TESTING AND ADJUST-
MENTS»).
Engine nuts: 80 Nm
1
2
REMOVAL AND INSTALLATION
ENGINE-PUMP GROUP
Summary of Contents for SK714-5
Page 1: ...WEBM005500 ...
Page 2: ......
Page 3: ...SK714 5 SK815 5 SK815 5 turbo WEBM005500 00 1 ...
Page 18: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 104: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 108: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 118: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 172: ......
Page 174: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 253: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 256: ......
Page 257: ......
Page 258: ...2003 ...