20-20
SK714-5 SK815-5 SK815-5 turbo
6 - Rotate the injection pump (5) towards the outside or
towards the motor, after having loosened the pump (6)
retaining nuts.
•
To BRING FORWARD the injection, rotate the
pump (5) towards the outside.
•
To DELAY the injection rotate the pump (5) towards
the cylinder block.
★
Check the extent of the movement on the scale (7).
7 - Lock the nuts (6) that fasten the pump to its block.
Pump fastening nuts: 25
–35 Nm
★
After adjustment of the fuel injection timing:
8 - Connect the fuel delivery tubes (4) to the pump and re-
place the clamp (3).
Delivery tube couplings: 31.85
±
2.45 Nm
9 - Bleed any air from the fuel circuit.
RKSA0090
5
6
7
TESTING AND ADJUSTMENTS
CONTROL AND ADJUSTMENT OF THE INJECTION TIMING
Summary of Contents for SK714-5
Page 1: ...WEBM005500 ...
Page 2: ......
Page 3: ...SK714 5 SK815 5 SK815 5 turbo WEBM005500 00 1 ...
Page 18: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 104: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 108: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 118: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 172: ......
Page 174: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 253: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 256: ......
Page 257: ......
Page 258: ...2003 ...