30-46
SK714-5 SK815-5 SK815-5 turbo
5 - Start the engine and allow the pinion (8) to turn slowly
until the master links (9) are both positioned on the up-
per section of the chain.
6 - Remove the pins (10) and pull out the master link (9).
7 - Turn the wheel hub (11) to release it from the chain.
8 - Attach the complete hub (11) to some hoisting tackle
and apply a slight tension to the cables.
9 - Loosen the nuts (12) and remove the hub (11).
★
Check the condition of the O-ring and put in a new
one if necessary.
Hub: 55 kg
INSTALLATION OF THE
WHEEL HUB
•
To install, reverse removal procedure.
Nuts: 186 Nm
Nuts: 29 Nm
★
Make sure that the master link is in the correct position
with respect to the pinion.
1 - Adjust the tension of the chains.
(For details, see «20. TESTING AND ADJUST-
MENTS»).
2 - Fill the oil up to maximum level.
Nuts: 235 Nm
RKSA0750
8
9
10
9
3
RKSA0760
11
12
11
12
4
RKS01760
9
9
1
2
3
RKS01771
Oil level
4
REMOVAL AND INSTALLATION
HUB WHEEL
Summary of Contents for SK714-5
Page 1: ...WEBM005500 ...
Page 2: ......
Page 3: ...SK714 5 SK815 5 SK815 5 turbo WEBM005500 00 1 ...
Page 18: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 38: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 104: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 108: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 112: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 118: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 126: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 172: ......
Page 174: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 253: ...PAGE INTENTIONALLY LEFT BLANK ...
Page 256: ......
Page 257: ......
Page 258: ...2003 ...