FP 25 E
Installation / Mounting
Issue: 06/2011
15
2 .3 .4 Installing and Connecting the Lamphouse Components
X
NOTE
Z
Connecting the lamphouse should be carried out by service personnel.
Z
The installation and adjustment of the xenon bulb and the adjustment of the intensity
of currents is described in chapter 6.4.11 and further on.
Z
The mirror should only be installed and adjusted by trained service personnel.
The reflector should only be changed and adjusted roughly by the projectionist in
case of need, therefore see chapter 6.4.15.
Z
Installing the heat filter is described in chapter 6.4.16.
Z
You will find the lamphouse connecting plan in chapter 8.3.3.
2 .3 .5 Adjusting the Projector Inclining
4
2
1
3
5
Lamphouse
Inclining table
Hexagon head screws in long holes
Spool tower / spool rack
Projector head
• Slightly loosen the 4 screws
on the inclining table
(2 on the front side and 2 on
the backside). The projector head
with the lamphouse will tilt against the bottom,
because the gravity centre is lying in front of the inclining axis.
• Adjust the projector head to the desired position and fix the inclining table by fasten-
ing all four screws
(maximum tilting angle: 10° to the bottom, 5° to the top).
Summary of Contents for FP 25 E PREMIERE
Page 2: ......
Page 22: ...FP 25 E Issue 06 2011 10 ...
Page 56: ...FP 25 E Issue 06 2011 44 ...
Page 64: ...FP 25 E Issue 06 2011 52 ...
Page 104: ...FP 25 E Issue 06 2011 92 Figure 1 1A 1C 1B 1D Figure 2 2A Fig 2A Fig 2B Fig 2C 2D 2B ...
Page 110: ...FP 25 E Issue 06 2011 98 10A Figure 11 Figure 11 11A 11B 11C Fig 11A Fig 11C Fig 11B ...