FP 25 E
Safety Instructions
Issue: 06/2011
9
1 .6 .6 Lamphouse Airflow Switch
As soon as the projector is switched on, the radial blower starts the operation. It is rea-
sonable to cool the xenon bulb directly.
If the air flow is interrupted, the xenon lamp will be switched off by the airflow switch
(arrow).
If the projector and the xenon lamp are switched off, the blower should run after about
ten minutes.
1 .6 .7 Heat Filter
Lamp power more than 2500 W needs a heat filter which has to be mounted in the lam-
phouse or in the projector’s film gate (see figure).
Lamphouses with metallic mirrors and all big lamphouses (4,000 - 7,000 W lamp power)
are equipped with a heat filter (200 x 200 mm).
The small lamphouse (700 - 3500 W lamp power) has no heat filter. But if necessary, a
heat filter (78 x 78 mm) can be inserted in the film gate.
Summary of Contents for FP 25 E PREMIERE
Page 2: ......
Page 22: ...FP 25 E Issue 06 2011 10 ...
Page 56: ...FP 25 E Issue 06 2011 44 ...
Page 64: ...FP 25 E Issue 06 2011 52 ...
Page 104: ...FP 25 E Issue 06 2011 92 Figure 1 1A 1C 1B 1D Figure 2 2A Fig 2A Fig 2B Fig 2C 2D 2B ...
Page 110: ...FP 25 E Issue 06 2011 98 10A Figure 11 Figure 11 11A 11B 11C Fig 11A Fig 11C Fig 11B ...