PAD-L
Applied Operation
4-29
Table 4-4
Constant (depend on model)
Type III
PAD
16-100L
PAD
35-50L
PAD
35-60L
PAD
60-35L
PAD
110-20L
PAD
250-8L
Type IV
-
PAD
35-100L
-
PAD
60-60L
PAD
110-30L
PAD
250-15L
Type V
-
PAD
35-200L
-
PAD
60-120L
PAD
110-60L
-
a [k
Ω
]
5.2
12
12
30
108
248
b [k
Ω
]
3.3
3.4
3.4
5
9.8
9.9
Starting master-slave-control series operation
CAUTION
•
To start master-slave-control series operation, always follow the
procedure below.
1.
Check that all POWER switches of the master and slave units are OFF.
2.
Turn on the POWER switch of each slave unit.
"C.V" lights up on the control panel of each slave unit, indicating that the unit is
in constant voltage operation mode. Because no signal is issued from the
master unit, the master remains in standby status.
3.
Turn on the POWER switch of the master unit.
"C.V" lights up on the master unit control panel, indicating that the unit is in
constant voltage operation mode.
Finishing the master-slave-control series operation
CAUTION
•
To finish master-slave-control series operation, always observe
the following procedure.
Failure may result if the POWER switch of a slave unit is turned off
before that of the master unit.
1.
Turn off the POWER switch of the master unit.
2.
Turn off the POWER switch of each slave unit.
Summary of Contents for PAD-L III Series
Page 4: ...II PAD L...
Page 16: ...P 6 Preface PAD L...
Page 40: ...2 12 Precautions and Preparations for Use PAD L...
Page 86: ...4 34 Applied Operation PAD L...
Page 98: ...5 12 Names and Functions of Controls PAD L...
Page 130: ...7 14 Specifications PAD L...