PAD-L
Safety Precautions
V
cal ground (safety ground).
• When applying power to the products from a switchboard, be sure work is
performed by a qualified and licensed electrician or is conducted under the
direction of such a person.
• Use the caster locks or stopper bolts to secure the power supply to an
installation location.
Relocation
• Turn off the power switch and then disconnect all cables when relocating
the product.
• Unlock the stoppers (caster locks and/or stopper bolts).
• Use two or more persons when relocating the product.
• Use extra precautions such as using more people when relocating into or
out of present locations including inclines or steps. Also handle carefully
when relocating tall products as they can fall over easily.
• Be sure the operation manual be included when the product is relocated.
Operation
• Before starting operations, inspect for abnormalities affecting the input
power voltage. Examine the exterior of the AC power cord. Cut off the
power supply before performing these inspections.
• If any abnormality or failure is detected in the products, stop using it imme-
diately. Disconnect the AC power cord from the switchboard. Be careful not
to allow the product to be used before it is completely repaired.
• For output wiring or load cables, use connection cables with larger current
capacity.
• Do not disassemble or modify the product. If it must be modified, contact
Kikusui distributor/agent.
Maintenance and checking
• To avoid electrical shock, be absolutely sure to stop applying power before
performing maintenance or checking.
• To maintain performance and safe operation of the product, it is recom-
mended that periodic maintenance, checking, cleaning, and calibration be
performed.
Service
• Internal service is to be done by Kikusui service engineers. If the product
must be adjusted or repaired, contact Kikusui distributor/agent.
Check?
Summary of Contents for PAD-L III Series
Page 4: ...II PAD L...
Page 16: ...P 6 Preface PAD L...
Page 40: ...2 12 Precautions and Preparations for Use PAD L...
Page 86: ...4 34 Applied Operation PAD L...
Page 98: ...5 12 Names and Functions of Controls PAD L...
Page 130: ...7 14 Specifications PAD L...